EDUCATION |
||
|
The Technical High School in Härnösand, B Sc, Mechanical Engineering |
1964 |
|
|
Military Service, Swedish Army, Sergeant |
1965 |
|
|
The Royal Technical University of Stockholm, M Sc, Mechanical Engineering |
1975 |
|
|
Danish Offshore School, Elementary Safety Course, Sea Rescue and Fire Fighting |
1991 |
|
|
Norway, Basic Safety and Emergency Preparedness Training |
1999 |
|
|
Swedish Scuba Divers Federation, Scuba diving certificate CMAS** |
1975 |
|
|
Various courses in engineering, contract administration, marketing etc |
1975- |
|
|
PREVIOUS EMPLOYMENTS |
||
|
Company / Position |
Track Record |
Period |
|
ASSA, Eskilstuna., Engineer |
Engineering of tools for the production department. |
1966-1967 |
|
Silkscreen Maskiner AB, Stockholm., Engineer |
Erection and service of printing machinery |
1967-1968 |
|
Nomaco, Stockholm. Senior Engineer |
Engineering of transport equipment, combat vehicles, rock drilling and sub sea drilling equipment etc. |
1968-1976 |
|
EMPLOYED BY NEPTUN |
||
|
Position: |
Duties |
Period |
|
Project Engineer |
R&D, Method development, project work / marine operations, marine equipment. Procedures and manuals |
1976- |
|
Engineering Manager |
Head of Engineering Department. responsible for R&D, method development, project work/marine operations,marine equipment, personnel matters etc. In charge of Marine Procedures and manuals.. |
1978- |
|
Sales Manager |
Marine Contracting work, responsible for method development, estimation, bid assembly, contract negotiations etc. |
1981- |
|
Manager, Marine Contracting Department |
Marine Contracting work, responsible for method development, estimation, bid assembly, contract negotiations, contract administration, project work, personnel matters etc. |
1983- |
|
General Manager, Neptun Engineering AB |
Marine Engineering and Contracting work, responsible for method development, estimation, bid assembly, contract negotiations, contract administration, project work including operations, personnel matters, general duties as general manager, etc. |
1986- |
|
General Manager, Neptun Engineering AB and Neptun Heavy Lift AB |
Marine Engineering and Contracting work, Responsible for method development, estimation, bid assembly, contract negotiations, contract administration, project work including operations, personnel matters, general duties as general manager, etc. |
1989- |
|
Senior Consultant, Neptun Heavy Lift |
Marine Engineering and Contracting work, method development, project work/marine operations,marine equipment, |
1999- |
|
THE NEPTUN PROFILE |
|
The Neptun Company have a comprehensive Track Record within: -towage, harbour, coastal and world wide -heavy lift transportation on flattop barges (Neptun have the current world record for heavy transports, the Gullfaks C Integrated Deck, 49,275 Mt) -heavy and high lifts with floating cranes (HEBE 1, HEBE 2, HEBELIFT 3, UGLEN, STANISLAV YUDIN) -salvage (Neptun was founded in 1871 and the leading salvage company in Sweden) -laying of marine cables (KONTISKAN, GOTLAND 2) -installation of heavy mooring systems |
|
MAJOR PROJECTS |
||
|
Project |
Position/Scope of Work |
Period |
|
Transports of dredgers, ferries, j/u rigs, modules etc |
Engineering Manager, Bid Manager, Project Manager |
1976-1992 |
|
Transport on barges of pressure vessels Japan-P.G for Aramco. |
Engineering Manager |
1978 |
|
Wreck removal of more than 20 wrecks, Port of Spain, Trinidad |
Engineering and Preparations Manager |
1979 |
|
Lifting of floating dock for repair at West Coast Norway. Weight to be lifted 36.000 T |
Bid Manager, Engineering Manager |
1980 |
|
Load out, Transport and Mating of N E Frigg Control Tower using two floating cranes in tandem. |
Bid Manager, Project Manager. Engineering Manager Development of manuals and procedures |
1983 |
|
Malmö ferry terminal. Concept based upon using a flat top barge equipped with two ramps. |
Bid manager, Project Manager, Engineering Manager |
1983 |
|
Load out,Transport and Installation of two 2400 t trusses to Statfjord B Integrated Deck Fredrikstad / Egersund to Stavanger |
Method development, Cost estimations, Deputy Engineering Manager |
1979 |
|
Load out,Transport and Installation of two 2400 t trusses to Statfjord C Integrated Deck. Hamburg / Invergordon to Stavanger |
Method development, Bid Manager, Project Manager. Engineering Manager. Procedures and manuals |
1981 |
|
Load out and Transport of Statfjord B Deck (40.000 T) from MRV Yard in Stavanger to Vats. |
Method development, Cost estimation, Contract negotiations, Deputy Engineering Manager |
1981 |
|
Load out and Transport of Statfjord C Deck (42.000 T) |
Method development, cost estimation, contract negotiatons. Member of the steering committee |
1983 |
|
Statfjord B Loading Buoy, Load Out onto a submersible barge, Float off and Tow. |
Engineering Manager |
1982 |
|
Transport of Hutton Templates Japan- North Sea |
Engineering Manager |
1982 |
|
Load out and Transport of Gullfaks A Deck (42.300 T) |
Method development, cost estimation, contract negotiatons. Member of the steering committee |
1986 |
|
Load out and Transport of Gullfaks C Deck (49.275 T) |
Method development, cost estimation, contract negotiatons. Member of the steering committee |
1989 |
|
Transport and float off of the Salhus Caisson (3500 T) from the submersible barge GOLIAT 9. |
Method development, Engineering, Project Manager |
1992 |
|
Salvage of M/S Feederchief |
Floating Crane operation. Engineering Manager |
1987 |
|
Salvage of M/S Astrea using 5 lifting craft in combination. |
Floating Crane operation. Engineering Manager |
1992 |
|
Salvage of GOLIAT 17 that had sunk in the port of Naadendal, Finland |
Salövage Engineer. Method development, Engineering, Commercial Manager |
1990 |
|
Salvage of FINNBALTIC and push tug unit thet had turned bottom up. |
Floating Crane operation. Method development, Engineering, Commercial Manager |
1990 |
|
Salvage of SIMA 3 that had sunk NW of Hirtshals, Danmark. |
Floating Crane operation. Salvage Engineer. Method development, Engineering, Commercial Manager |
1991 |
|
TROLL B, MSF Transport and Mating Operations. |
Senior Lead engineer, MSF Transport and Mating, Module lifting. In charge of Marine Procedures and Manuals.,Project Coordinator for MSF Transport and Mating. Module lifting. Operations Manager for MSF Transport and Mating |
1992-1995 |
|
Salvage of M/S KREVA |
Floating Crane operation. Salvage Engineer. Method development, Engineering |
1995 |
|
Wreck removal of M/S SEKSTAN using 2 flat top barges for lift off until reaching deeper water. |
Salvage Engineer. Method development, Engineering, |
1995 |
|
Potable water transport Stockholm - Visby using barges for transport and storage. |
Method development. |
1995-1996 |
|
Risk handling plan Goeta Canal (in case of grounding in shipping channel). |
Development of plan for salvage |
1995-1996 |
|
Docking of SS P26 (ex ILIAD) on a submersible barge |
Method Development, Engineering, Commercial Manager |
1995 |
|
Salvage of M/S Gripsholm |
Salvage Engineer, Calculation of stability, ground reaction forces etc. Assistant Salvage Manager during operation. |
1996 |
|
Transport and Mating of Integrated Deck for TLP in UK sector., Study |
Conceptual engineering. |
1996 |
|
Salvage of M/S Koralle that was about to turn bottom up S of Varberg at the Swedish West coast. |
Salvage Engineer. Method development. Calculation of stability, ground reaction forces etc Assistance to Salvage Master. |
1996 |
|
Pulp wood transport in the Baltic Sea using a push-tug / barge system. |
Development of system |
1995-1996 |
|
Hibernia Topsides Load out, Transport and Mating operations. |
Planning of operations. Development of Operations Manuals and Procedures. Support Manager (Structural work, sea fastening activities, final positioning etc) during preparation and operation in Canada. |
1996-1997 |
|
Salvage of M/S SeaWind that had been grounded in the Stockholm archipelago. |
Technical advisor |
1997 |
|
SAGA/VARG Coflexip Stena Offshore Installation of sub sea buoy acting as support for the risers. |
Engineering of the ballast system and sub sea operations. Deputy Installation Supervisor during installation |
1997 |
|
ESSO/KVAERNER JOTUN FPSO Project |
Coordinator for the DNV Classification activities. Assisting Operations Coordinator. |
1998 |
|
STORA/ENZO Brazil Veracell Pulp Mill Project. |
Conceptual proposal regarding a push barge system for coastal transportation of pulp. |
1998 |
|
Royal Swedish Navy |
Training of Salvage Superintendents |
1999 |
|
Röda Bolaget / Salvage of M/S Bernati |
Training of Salvage Superintendents |
1999 |
|
Nordic Wind Power AB |
Marine Operations Coordinator for installation of a Windmill Farm of 34 units offshore. |
1999 |
|
Röda Bolaget / Skandia Insurance Co Ltd /Salvage of M/S ICE STAR |
Technical advisor |
1999 |
|
Röda Bolaget / Salvage of M/T Sirius |
Salvage Engineer |
1999 |
|
Nordic Insurance Pool for Merchant Ships |
Lefture about methods for salvage of ancient wrecks |
2000 |
|
Röda Bolaget /Removal of M/V Martina |
Technical advisor |
2000 |
|
Swedish Shipping Administration |
Development of technical input for estimation of environmental forces during towage. |
2000 |
|
Royal Swedish Navy. Removal of sunken Quay |
Investigation and technical evaluation for removal |
2001 |
|
Röda Bolaget / Port engineering |
Engineeriing in connection with installation of a floating quay |
2001 |
|
Röda Bolaget / Wreck removal |
Technical advisor for removal of two wrecks |
2002 |
|
Jumbo Navigation BV/ Heavy Lift Ship M/V Jumbo Vision |
Independent surveyor in connection with transport from Sweden to US Gulf |
2002 |
|
Impac Offshore gmbh / Load out and transport of 2400 t compressor module for the Snövit project |
Up front engineering to be used for the design of the module. |
2002 |
|
Master Marine a.s./ Development of systems on vesselt for removal of offshore platforms. |
Design engineer, systems specialist |
2002 |
|
Röda Bolaget / Oil removal M/V Albakor |
Salvage engineer |
2002 |
|
Jumbo Navigation BV/ Heavy Lift Ship M/V Daniella |
Independent surveyor in connection with transport from Norway to West Africa |
2003 |
|
Röda Bolaget / Salvage of M/V Nordvik |
Salvage Engineer |
2003 |
|
Röda Bolaget AB / Dredging Project in the Port of Gothenburg |
Techcal assistance in connection with bid for marine services. |
2003 |
|
Trimar Sterling Group |
Assistance in connection with a large bid for oil pollution control equipment for Vietnam |
2003 |
|
Trimar Sterling Group/Fortnum Oy |
Marine system coordinator in connect a study for a new oil export terminal for S:t Petersburg, Russia |
2004 |
|
Impac Offshore Gmbh/Kavala Oil |
Marine Ops Superintendent for installation of a Drill Rig onto a fixed Platform in Agean Sea, Greece |
2004 |
|
Impac Offshore Gmbh/Kavala Oil |
Marine Ops Manager for Engineering/Construction/Installation of a fixed platform (Jacket type) in Aegan Sea |
2004 |
Back to Karl Bolin's Home Page